The valuation has come back and somewhere in it is a line telling the lender to obtain a structural engineer's report. Nothing has been decided about the house. A question has been asked, and the mortgage application waits until somebody answers it. This guide covers what that question is, who answers it, who pays, how to stop it costing you your dates, and what happens if the answer is not the one you hoped for.
Why valuers refer properties
A mortgage valuation is carried out for the lender, not for you. The government's How to buy a home guide describes it as the mortgage provider checking that they are happy to lend against the property, and is blunt about its limits: "This is not a survey". RICS, the surveyors' professional body, says the same: the valuation advises the lender of the property's value and of anything, including significant defects, that might affect its value as security for the loan. It involves a brief inspection - RICS puts it at usually less than 20 minutes - and "should not be confused with a survey".
So the valuer is not there to diagnose defects. When they see something structural that they are not in a position to judge - cracking, a leaning wall, a removed chimney breast, a roof that has spread - they say so and recommend a structural engineer's report. That recommendation is the referral. It is not a verdict on the house. It means a question has come up that the valuer is not the right person to answer.
The same thing happens one step along when a RICS Level 2 or Level 3 survey flags a structural concern. Our guide to surveys, homebuyer reports and Level 3 explains why each of them refers structural questions on.
What the lender needs from the report
Start with the wording. RICS notes that many, but not all, lenders give the applicant a copy of the valuation report or an extract from it, and that a query about the valuation should go to your mortgage provider. Ask your lender or broker for the exact sentence the valuer wrote, because the report has to answer that sentence. Most referrals come down to some version of these questions:
- What has caused the cracking or movement that was seen?
- Is the movement old and finished, or is it still going on?
- Is the structure adequate as it stands - for example where a wall or a chimney breast has been taken out?
- Does anything need to be done, and if so what?
An engineer's report replaces the open question with a stated cause, a stated significance and a stated recommendation. That is what a structural engineer's report for a mortgage or sale is for.
Check who the lender will accept the report from. Some lenders and insurers ask for a report from a chartered engineer and may name particular memberships - our guide to what 'chartered' means and how to check explains the letters. Our engineers are Chartered Engineers, CEng MSc MICE. Acceptance is always the lender's decision, and nobody can tell you in advance what a lender will decide once it has the report.
Who instructs and who pays
By default the buyer commissions the report and the buyer pays for it. The lender requires the report; it does not pay for it. A report belongs to the person who commissioned it and is written for their purposes, which is why it should be commissioned in the name of whoever needs to rely on it.
There are situations where the seller pays, and should - where a chain is stalling because a lender has referred the valuation, the seller can have more to lose from delay than the buyer - and plenty of sales split the cost. Who pays for a structural engineer's report goes through each case. Whoever pays, do not let the argument about the bill delay the instruction.
How long it takes, and protecting an exchange date
There are two timescales: the visit and the report. A focused inspection of one defect is usually under an hour on site. Our report is issued within 10 working days of the inspection, guaranteed. How long a structural survey takes sets out the whole timeline.
A report that arrives after exchange is worth nothing, because you can no longer act on it. To keep the purchase on track:
- Instruct as soon as you have the valuer's wording, rather than waiting to see whether the lender will drop the point
- Give the deadline in your first message, so you are told before you commit whether it can be met
- Arrange access early - on a sale that is usually through the estate agent
- Tell your solicitor and broker that a report has been commissioned and when it is due, so nobody exchanges ahead of it
- Send the report to the lender as soon as you have it
Some questions cannot be answered from one visit. Monitoring to establish whether movement is still going on takes months, because it has to cover the seasons; trial pits, drainage tests and opening-up need a contractor. Where one of these is needed the report says so and explains why, and gives an interim position. That is slower than anyone wants, but it is better than a guess.
If a real problem is found: repairs, retentions and renegotiation
Findings come in three kinds: historic and stable, which needs no work, only the written confirmation; a defined defect, which is specific and can be priced; and an open question that needs something further. If the report finds a defined defect, a buyer has four options, all legitimate:
- Proceed as agreed, because the finding is minor
- Renegotiate the price on the basis of the work the report describes
- Ask for a retention, where a sum is held back until the work is done
- Walk away, which is much cheaper before exchange than after
The report says what needs doing, not what a local builder will charge for it, so get the work priced by a contractor before you name a figure. Whether the lender will lend as things stand, wants the work done first or will lend with a retention is the lender's decision, made on the report. We cannot predict it, and we do not write a cleaner answer than the evidence supports in order to help it along.
We do not carry out repairs and take no commission from anyone who does. Where a repair needs designing - a beam, a support for an earlier alteration - that can follow as a separate piece of work. What happens after a structural survey finds a problem covers the next steps for buyers and sellers.
What to send with your enquiry
- The exact wording of the valuer's, surveyor's or lender's comment - a photograph of the paragraph is fine
- The address, and the listing if the property is on the market
- Any photographs you have of the defect
- Any paperwork that bears on it - an earlier engineer's report, a Building Regulations completion certificate, details of past repairs
- Who can give access, and the date you are working to
Reports on a referral are quoted individually, because one flagged defect and a whole-building question are different amounts of work. You get a fixed quote in writing, with the timescale, before you commit. For comparison, our full structural survey and report is from £580 + VAT.
Sources
- How to buy a home (GOV.UK, Ministry of Housing, Communities and Local Government) - sections 15 and 16, mortgage valuation and survey - checked 16 November 2026
- RICS Find a Surveyor - Mortgage valuations - checked 16 November 2026
Frequently asked questions
Does a referral mean the house is unsafe?
No. It means the valuer saw something they are not in a position to judge and has asked for an engineer's opinion. On older property the finding is often that something moved long ago, finished, and the building is sound. Until an engineer has inspected, nobody knows which it is - including the valuer.
Can the seller's report be used?
Sometimes, but do not assume it. A report is written for the person who commissioned it, and a lender may not accept one that was produced for the seller. Ask your lender before relying on it. If you are the one who needs to rely on the report, it should be commissioned in your name.
Will a surveyor's report do instead?
Go by the wording of the referral. If it asks for a structural engineer's report, a general survey does not answer it: a Level 2 or Level 3 survey that meets a live structural question will itself refer you to a structural engineer.
What if the movement is historic?
Then the report says so, with the reasons, in language a lender or buyer can rely on. No work is needed for movement that is old and finished; what is needed is the written confirmation. What the lender then decides is the lender's call.
What happens to a retention?
A retention is a sum held back until the work is done. Whether one is offered, how much it is and what evidence releases it are set by whoever is holding the money, so ask for those terms in writing before you agree to it. Keep the report, any design, the invoices and any Building Control completion certificate - that file is what answers the question afterwards.